August 15, 2016

Szabo Ranch Concrete and Steel Underway

The Szabo Ranch home is full steam ahead in construction. Lower floor concrete is now poured and steel is being placed to support upper floor and cantilevered deck. One will soon be able to stand on upper floor and see those beautiful mountains we call the Sutter Buttes.DSC_0182

CONTACT US

+ 1(650)323-1890 | info@tobinarchitects.com